2031 Metrics · target 2 of 8 · code 10

10,000 MW of generation capacity

Explore the evidence first. End-2031 is assumed; the speech gives no year. Read the President's claim ↓

Baseline
(2025)
Target
by end-2031, assumed
Growth needed
a year
Best on record
a year
Needed ÷ best
beyond precedentproposed

Dotted figures open their receipts: the source, its date and how each number is calculated.

To compare electricity figures on the same basis (E1–E4), we would need to reconcile regulator and Ministry dates, definitions and plant coverage. Assessing dependable supply would also need evidence beyond installed capacity. Inspect the evidence ↓

The record

Installed generation capacity (regulator) (MW)
02,5005,0007,50010,00020152020202520302035end-2031 (assumed)4,108 (2025)gap 4,037Target 10,000needs 16.0% a year5,963at the best pace, 6.4%

Focus the chart and use Left and Right to read each year; Home and End jump to its limits.

  • Recorded
  • Required path
  • Best pace on record, carried forward (not a forecast)
  • Target

Source: ERB Energy Sector Report 2025 (ERB). Source note: ERB Energy Sector Reports 2015-2025 (2023: 3,811.3 or 3,812.06 or 3,811.37 by report). Lines join consecutive years only; a gap means no figure for that year. The dashed line is arithmetic, not a forecast: the fastest 5-year growth on record (rebounds from a collapse left out), continued from the baseline.

Data table (12 points)
PeriodMW
20142,396
20152,411
20162,826.91
20172,896.91
20182,898.23
20192,981.31
20203,011.23
20213,318.43
20223,777.3
20233,811.3
20243,885.86
20254,107.86

Installed is not available

Hydro was of installed capacity on the Ministry of Energy's November 2025 slide (of 3,877 MW; another Ministry-attributed mix differs, see the capacity conflicts), so a megawatt on paper needs water behind it. Kariba is the largest store. Step through the Zambezi River Authority's readings to see the lake drain in the drought and refill.

  • Upper dashed line: full supply level
  • Lower solid line: minimum operating level
  • Usable water: 38.19%
  • Dead storage: below the turbine intakes

2D cross-section.

Schematic, not a survey: a straight valley, not Kariba's real shape. The water shows the share of usable volume, between the minimum operating level and the full supply level; the valley widens as it rises, so a small share still shows some height.

The claim

electricity generation capacity to 10,000 megawatts

President Hichilema, opening of the 14th National Assembly, 9 October 2026, p. 17, 39. No target year is given.

Related claims in the speech

  • reportedIn the first term clean thermal and solar generation were expanded, and household and institutional solar increased generation. (p. 17)
  • assertionNational energy sufficiency and surplus cannot be achieved by Government investment alone. (p. 17)
  • targetThe national transmission network will be upgraded and expanded, linked to regional power pools, with public-private participation in transmission and distribution. (p. 17)

Baseline audit

National installed generation capacity

reconciliation pending

Installed capacity 4,107.86 MW at end-2025 (ERB, re-opened); Ministry 4,576 MW (Sep 2026) and 4,722 MW (7 Oct Energy Forum address); that address's '3,777 MW in 2024' is ERB's 2022 figure

Against the speech
The 9 Oct speech states no MW total; the 4,722 MW figure was said on 7 Oct at the Energy Forum.
Where it comes from
ERB (regulator) vs Ministry/presidential statements with no primary document
What would make it wrong
A primary Ministry document reconciling 4,576/4,722 MW to ERB.
All 9 records for E1
ValueWhat it isAs ofSourceTagRe-opened
4,107.86MW installed (grid 4,101.60 + off-grid 6.26)
“increased to 4,107.86MW in 2025, up from 3,885.86 MW in 2024”
31 Dec 2025ERB Energy Sector Report 2025
primary · EC:S1
V · Primary source openedLogged source recheck: V14
3,885.86MW installed2024ERB Energy Sector Report 2024
primary · EC:S3
V · Primary source openedNo independent recheck logged
3,871.37MW installed (MoE text says 3,871.32)2024MoE Energy Sector
primary · EC:S12
V · Primary source openedNo independent recheck logged
3,877MW installed27 Nov 2025MoE Zim-Zam Summit slides
official-comms · EC:S13
L · Verification pending: secondary or unopenedNo independent recheck logged
79.6% of installed capacity that is hydro (of 3,877 MW)27 Nov 2025MoE Zim-Zam Summit slides
official-comms · EC:S13
L · Verification pending: secondary or unopenedNo independent recheck logged
3,808MW currently
“currently stands at 3,808 MW”
10 Feb 2026National Assembly record
official-comms · EC:S15
L · Verification pending: secondary or unopenedNo independent recheck logged
4,576MW
“4,576 MW, up from 3,100 MW in 2021”
reported Aug-Sep 2026Green Building Africa
secondary · EC:S22
L · Verification pending: secondary or unopenedNo independent recheck logged
4,722.3MW currently (from 3,777 MW in 2024)7 Oct 2026Solwezi Today
secondary · EC:S18
L · Verification pending: secondary or unopenedNo independent recheck logged
3,777.3MW installed (this is ERB's 2022 total)2022ERB Energy Sector Report 2022
primary · EC:S5
V · Primary source openedNo independent recheck logged
Conflicts and cautions (6), reported, never averaged
  • 2025 additions per ERB: Chisamba 100, Mailo 25, UCF coal 85, KGL mini-hydro 12 = 222 MW.
  • The 7 Oct Energy Forum address's 2024 base of 3,777 MW is ERB's 2022 figure; ERB, MoE and the Ministry's Nov 2025 slide give 3,871-3,886 MW for 2024. On the 3,777 base the 2024-to-Oct-2026 gain is 945 MW; on ERB's 3,885.86 it is 837 MW.
  • The 10 Feb 2026 Hansard figures do not add up: 3,168 + 712 = 3,880 MW, not 3,808 MW; a transposition is possible but unverified.
  • Between the 4,576 and 4,722.3 figures the total rises 146 MW while solar rises 187 MW (841 to 1,027.5): non-solar capacity falls about 40 MW, so the bases or dates differ.
  • S23 (Freight News) gives a source mix of hydro 84, coal 9, HFO 5, solar 3 percent for the 4,576 MW, which cannot fit 841 MW of solar (18% of 4,576).
  • ERB moved the 110 MW Ndola HFO plant to diesel in 2024, while MoE keeps HFO at 110 MW.

Solar capacity and the 1,000 MW target

reconciliation pending

Solar 308 MW grid-tied at end-2025 (ERB, re-opened); 841 MW (end-Jul 2026, Ministry via press); 1,027 MW (7-8 Oct 2026, MoE page, re-opened)

10 records, against the speech and kill criterion
Against the speech
The 1,000 MW target was first set for end-2025; the page gives no plant breakdown.
What would make it wrong
An itemised plant list or an ERB/ZESCO update.
ValueWhat it isAs ofSourceTagRe-opened
308.00MW grid-tied solar (plus 0.12 off-grid)
“installed renewable energy capacity increased from 182MW in 2024 to 348MW in 2025”
Dec 2025ERB Energy Sector Report 2025
primary · EC:S1
V · Primary source openedLogged source recheck: V14
183.00MW solar2024ERB Energy Sector Report 2024
primary · EC:S3
V · Primary source openedNo independent recheck logged
841MW solar
“reached approximately 841 MW by the end of July 2026”
end-Jul 2026pv magazine
secondary · EC:S21
L · Verification pending: secondary or unopenedNo independent recheck logged
1,027.5MW solar (21.7% of 4,722.3 MW)
“surged from 178MW in 2024 to 1,027.5MW”
7 Oct 2026Solwezi Today
secondary · EC:S18
L · Verification pending: secondary or unopenedNo independent recheck logged
1,027MW solar, from 178MW (no year given for the 178MW baseline); no breakdown by plant
“solar capacity had risen from 178MW to 1,027MW, exceeding the 1,000MW target.”
published 8 Oct 2026Zambia hits 1,000MW solar target
official-comms · TR:S10
L · Verification pending: secondary or unopenedLogged source recheck: V17
136MW Itimpi II brought online2 May 2026Enerdata (Itimpi II)
secondary · EC:S31
L · Verification pending: secondary or unopenedNo independent recheck logged
50MW Mansa (Mabumba) commissioned24 Apr 2026SolarQuarter (Mansa)
secondary · EC:S29
L · Verification pending: secondary or unopenedNo independent recheck logged
100MW Chisamba II commissioned21-22 Jul 2026ITWeb
secondary · EC:S28
L · Verification pending: secondary or unopenedNo independent recheck logged
100MWac Maamba/Nava feeding the grid, still in commissioningfrom 24 Sep 2026Ecofin Agency
secondary · EC:S26
L · Verification pending: secondary or unopenedNo independent recheck logged
89.13MW solar2020ERB Energy Sector Report 2021
primary · EC:S6
V · Primary source openedNo independent recheck logged

Conflicts and cautions, reported, never averaged:

  • ARITH: pv magazine's 584 MW omits Riverside, Bangweulu and Ngonye (122 MW per ERB); adding them leaves a gap of about 105 MW to 841, not 227 MW. 1,027.5 less 841 less Maamba 100 leaves about 86 MW unexplained.
  • ERB end-2025 grid solar was 308 MW; 841 MW by end-July needs about 533 MW added in 7 months; the plants the agent could verify add about 286 MW.
  • An explicit statement moving the deadline from end-2025 to end-2026 was not found. In Aug 2025 the target was 'additional' 1,000 MW; in 2026 it is a total of 1,000 MW: different bases.
  • AFSIA counts 1.15 GW operational (28 Jul) and 1.33 GW (25 Sep) per press; not opened.
  • The ~882 MW (1 Oct) figure mentioned in the brief was not found.

Generation, demand, availability and load-shedding

documented baseline

2025 average generation 1,488.93 MW vs average demand 2,217.52 MW; peak demand 2,204 MW; load-shedding up to 16 h a day (a utility's account)

9 records, against the speech and kill criterion
Against the speech
A '24-hour supply' projection (Feb 2026) has no later data behind it.
What would make it wrong
ERB or ZESCO 2026 load-shedding data.
ValueWhat it isAs ofSourceTagRe-opened
1,488.93MW average generation (average demand 2,217.52 MW; deficit 728.59 MW)
“average generation was 1,488.93MW. The average demand was 2,217.52MW”
2025ERB Energy Sector Report 2025
primary · EC:S1
V · Primary source openedLogged source recheck: V14
2,217.52MW average demand2025ERB Energy Sector Report 2025
primary · EC:S1
V · Primary source openedLogged source recheck: V14
2,204MW peak national system demand
“Peak national system demand was 2,204MW in 2025 compared to 2,299MW”
2025ERB Energy Sector Report 2025
primary · EC:S1
V · Primary source openedLogged source recheck: V14
1,635MW available domestic10 Feb 2026National Assembly record
official-comms · EC:S15
L · Verification pending: secondary or unopenedNo independent recheck logged
1,850MW average generation (590 MW deficit; 2,400 MW peak demand)Nov 2025MoE Zim-Zam Summit slides
official-comms · EC:S13
L · Verification pending: secondary or unopenedNo independent recheck logged
14,560.23GWh generation sent out2025ERB Energy Sector Report 2025
primary · EC:S1
V · Primary source openedLogged source recheck: V14
20hours per day, up to, of load-sheddingMar-Dec 2024ERB Energy Sector Report 2024
primary · EC:S3
V · Primary source openedNo independent recheck logged
16hours per day, up to, of load-shedding2025ERB Energy Sector Report 2025
primary · EC:S1
V · Primary source openedLogged source recheck: V14
2,119.70GWh ZESCO imports (exports 1,690.98)2025ERB Energy Sector Report 2025
primary · EC:S1
V · Primary source openedLogged source recheck: V14

Conflicts and cautions, reported, never averaged:

  • 1,635 MW (the Minister's statement) vs 1,900 MW (the same Minister in Q&A) vs ERB's 1,489 MW average for 2025.
  • Peak demand fell in 2025 (2,204 vs 2,299 MW) while ERB reports consumption up 48%: see K4.

The 10,000 MW target: year, origin and pipeline

verification caveat

10,000 MW: year none (speech), 2030 (MoE Nov 2025, Hansard Feb 2026), 2031 (a VP-speech report, government projection of 10,182 MW)

11 records, against the speech and kill criterion
Against the speech
From 4,108 MW (ERB) the gap is about +5,900 MW; no pipeline project beyond Maamba II, Gouli and Batoka is dated.
What would make it wrong
The origin document for 10,000 MW stating a year.
ValueWhat it isAs ofSourceTagRe-opened
10,000MW generation capacity, no year stated
“To expand electricity-generation capacity to 10,000 megawatts”
9 Oct 2026President's speech
official-comms · EC:S16
L · Verification pending: secondary or unopenedNo independent recheck logged
10,013MW by 2030 (23,193 MW by 2050; peak demand 5,422 MW by 2030)27 Nov 2025MoE Zim-Zam Summit slides
official-comms · EC:S13
L · Verification pending: secondary or unopenedNo independent recheck logged
10 GWproduction target by 2030
“our target is to reach 10 GW production by 2030”
10 Feb 2026National Assembly record
official-comms · EC:S15
L · Verification pending: secondary or unopenedNo independent recheck logged
10 GWby 2030, from 3.7 GW in 202327 Aug 2025Zambia Monitor (Chikote, 10 GW)
secondary · EC:S41
L · Verification pending: secondary or unopenedNo independent recheck logged
10,000MW 'absolute minimum of reliable power' by 20317 Oct 2026Streamlinefeed
secondary · EC:S19
L · Verification pending: secondary or unopenedNo independent recheck logged
10,182MW total projected for 2031 (solar 2,733, hydro 4,279, thermal 2,555)28 Sep 2026Ecofin Agency
secondary · EC:S26
L · Verification pending: secondary or unopenedNo independent recheck logged
2,400MW Batoka Gorge (2 x 1,200); cost $4.2bn; no start or commissioning date29 Dec 2025Ecofin (Batoka)
secondary · EC:S47
L · Verification pending: secondary or unopenedNo independent recheck logged
2x150MW Maamba Phase II, 'more than 65% complete'Mar 2026Energy News Network (Maamba II)
secondary · EC:S49
L · Verification pending: secondary or unopenedNo independent recheck logged
135MW Gouli (Livingstone) phase 1 technical commissioning Oct 2026; phase 2 about mid-2027Sep 2026Green Building Africa
secondary · EC:S22
L · Verification pending: secondary or unopenedNo independent recheck logged
750MW Kafue Gorge Lower (5 x 150), completecommissioned 13 May 2023ConstructAfrica (KGL)
secondary · EC:S51
L · Verification pending: secondary or unopenedNo independent recheck logged
6,342 / 7,940 / 9,971MW total installed for 2026 / 2030 / 2040 (IRP D5.3, restricted)30 Jun 2022IRP D5.3 Generation report (restricted)
primary · EC:S45
V · Primary source openedNo independent recheck logged

Conflicts and cautions, reported, never averaged:

  • The year attached to 10,000 MW varies: none (the speech), 2030 (Hansard Feb 2026, MoE Nov 2025, Chikote Aug 2025), 2031 (a VP-speech report framing it as a minimum requirement, and the government's 2031 projection of 10,182 MW). The speech states no year.
  • The 8NDP (Aug 2022) target was 4,457 MW by 2026, not 10,000 MW; the origin document and date of the 10,000 MW figure were not found. The earliest 10,000 MW references opened are Aug 2025 and Nov 2025.
  • Mission 300 compact (described in secondary sources as signed Jan 2025) returned 404; ZARENA brief cites '10,000 MW installed capacity by 2030'.

El Nino outlook and the 2023/24 drought calibration

documented baseline

NOAA CPC 8 Oct 2026: El Nino Advisory, Nino-3.4 +2.1C, strong-to-very-strong likely through JFM 2027; Kariba 38.19% usable (14.30% a year ago)

13 records, against the speech and kill criterion
Against the speech
Holds. The Met Department forecast is below-normal rain for most of Zambia; above-normal rain is forecast only for the northern provinces, so flooding is regional.
What would make it wrong
NOAA's 12 Nov update.
ValueWhat it isAs ofSourceTagRe-opened
+2.1deg C Nino-3.4; El Nino Advisory in force
“strong-to-very strong El Nino likely through January-March 2027”
8 Oct 2026NOAA CPC ENSO discussion
primary · EC:S53
V · Primary source openedLogged source recheck: V15
near-100% likelihood of El Nino persisting through Feb 2027
“near-100 per cent likelihood”
8 Oct 2026WMO
primary · EC:S54
V · Primary source openedNo independent recheck logged
100% El Nino probability SON to FMA 202721 Sep 2026IRI ENSO forecast
primary · EC:S56
V · Primary source openedNo independent recheck logged
Below-Normalrainfall likely over much of Zambia; prolonged dry spells in DJF in the southern half
“Below-Normal rainfall is likely over much of Zambia”
11 Sep 2026ZMD 2026/27 Seasonal Rainfall Forecast
primary · EC:S58
V · Primary source openedNo independent recheck logged
38.19% usable storage, Kariba (480.85 m)4 Oct 2026ZRA Kariba reservoir data
primary · EC:S59
V · Primary source openedLogged source recheck: V16
48.55% usable storage, Kariba (482.21 m), the 2026 peak27 Jun 2026ZRA Kariba reservoir data
primary · EC:S59
V · Primary source openedNo independent recheck logged
14.30% usable storage, Kariba (477.56 m), the same date a year earlier4 Oct 2025ZRA Kariba reservoir data
primary · EC:S59
V · Primary source openedLogged source recheck: V16
6.45% usable storage, Kariba (476.43 m), the same date two years earlier4 Oct 2024ZRA Kariba reservoir data
primary · EC:S59
V · Primary source openedLogged source recheck: V16
19,372.92 to 13,324.38GWh generation, 2023 to 2024: -31.2%, the largest decline in 10 years2023/24 droughtERB Energy Sector Report 2024
primary · EC:S3
V · Primary source openedNo independent recheck logged
31.2% fall in national generation sent out, 2023 to 20242023/24 droughtERB Energy Sector Report 2024
primary · EC:S3
V · Primary source openedNo independent recheck logged
41.4% fall in Kariba North Bank generation, 2023 to 20242023/24 droughtERB Energy Sector Report 2024
primary · EC:S3
V · Primary source openedNo independent recheck logged
5.4 to 4.0% GDP growth, 2023 to 2024 (ERB's wording); World Bank now has 5.37 to 3.822024ERB Energy Sector Report 2024
primary · EC:S3
V · Primary source openedNo independent recheck logged
3,263 to 1,510kt maize, USDA via IndexMundi (-53.7%)2023/24IndexMundi (USDA data), Zambia maize
secondary · EC:S64
L · Verification pending: secondary or unopenedNo independent recheck logged

Conflicts and cautions, reported, never averaged:

  • NOAA CPC's +2.1C and its +2.5C 'historic' threshold use a relative index (RONI); WMO's +3.7C is a seasonal forecast. They are not directly comparable.
  • SARCOF-33 (25-28 Aug 2026) favoured below-normal for southern Zambia in OND and wetter in the extreme north; the Met Department's national outlook is broader. The 'flooding' half of the speech's claim is regionally narrow.
  • Kariba a year and two years earlier: the research agent read 14.37% (477.57 m) and 6.52% (476.44 m) from the ZRA page; my re-opening (V16) read 14.30% (477.56 m) and 6.45% (476.43 m). The re-opened figures are the records.

What the target implies

Note: Electricity: the one exception on record is solar, from about 178 MW to a claimed 1,027 MW in about two years (unaudited), which is outside the ERB totals' own history.

16.0%growth a year, for 6 years

From 4,108 (2025) to 10,000 by the end of 2031: 2.4x the baseline.

Best sustained pace on record
6.4% a year (2020-2025, 5-year window)
Required ÷ best
2.5x beyond precedentproposed
Without the 25% base rule
best 6.4% (2020-2025), ratio 2.5x beyond precedentproposed

The speech states no year; end-2031 is our assumption, the end of the five years the speech refers to. The 25% rule leaves out growth from a collapsed base (an analyst choice, not yet adopted). Bands are a proposal, not a forecast or a probability.

Note on the baseline: base is ERB end-2025; Ministry's 4,722 MW (Oct 2026) would lower the required pace but is unreconciled

Copy this page's address to share the assumed year and baseline choice.

Capital and delivery

Band, and what would change it

Proposed band at end-2031:beyond precedentproposedWithout the 25% rule:beyond precedentproposed

A band compares the required pace with the best pace on record. It is arithmetic, not a forecast and not a probability. The band rule is a proposal, not yet adopted.

Proposed band for each target by assumed target year: required growth divided by the best pace on record.
Targetend-2028end-2029end-2030end-2031end-2032end-2033end-2034end-2035
From the regulator's end-2025 figurebeyond precedent to 2032 · stretch from 20335.4x beyond precedent3.9x beyond precedent3.0x beyond precedent2.5x beyond precedent2.1x beyond precedent1.8x stretch1.6x stretch1.5x stretch
on pace: at or below the best pace on recordstretchbeyond precedentnot assessableEach cell: growth needed a year ÷ the best sustained growth on record. The outlined column is the default year. A proposed rule, not yet adopted; not a forecast.

All targets on the assumption map →

Confidence in the baseline
High for ERB 2014-2025 totals. Low for the 2026 figures: no primary document or breakdown exists.
What would change it
A primary Ministry document reconciling 4,576/4,722 MW to ERB.

Audit findings for this target

  • The 1,027 MW solar and 4,722 MW capacity figures are from the 7 Oct Energy Forum address, not the 9 Oct Parliament speech, and remain unreconciled with the regulator's earlier figures. Provisional reading · confidence: high that they were said and where; low on whether they are right

    Evidence: Speech text has no such figures (checked); ERB: 308 MW solar and 4,107.86 MW total at end-2025. Kill criterion: A primary Ministry document reconciling the figures to ERB. Competing explanation: ERB may be reporting grid-tied, commissioned plant while the Ministry counts plant under commissioning.

  • '3,777 MW in 2024', said in the 7 Oct Energy Forum address (not the 9 Oct speech), is ERB's 2022 total, not its 2024 total (3,885.86 MW). Provisional reading · confidence: high

    Evidence: ERB 2022 report 3,777.3 MW; ERB 2024 3,885.86 MW; the 9 Oct speech text has no MW figure except the 10,000 MW target (checked). Kill criterion: An ERB restatement of 2024 to 3,777 MW. Competing explanation: The Ministry may use a different basis (firm vs installed capacity).

These are provisional readings of the cited evidence. See the notes above and what we would need to check to strengthen the comparisons.